Finishing the bulkheads and cockpit area.

March 24, 2008

The finishing of this first main hull half with all the structural bulkheads and the making of the cockpit coaming, emergency escape hatch and the safety compartment.

Cockpit area.

Also a video of the infusion of the escape hatch coaming.

Advertisements

Finishing the final details on the second float.

January 2, 2006

In this album the completion of the second float. Post curing, wingnet lashing rail and the hatches.

Final contruction details


Finishing the first float.

May 22, 2004

This photo galery is about the finishing work on the first float.

The wingnet fastening is with an integrated molded lashing rail with a fiberglass tube. Another purpose of this rail is to create three strong deck eyes, as an alternative for bolted SS pad eyes. The extra strength is created by carbon reinforced foam pads, which goes through the hull and are laminated to the inside, the middle one also in the shroud bulkhead.

Also the making of two deck hatches (with invisible hinges) and after all the glassing is done, the final post curing of the whole hull before the fairing goes on.

The fairing and sanding turned out to be a real investment in learning time and finally succeeded by dogged perseverance. It’s the last 300 gram of fairing compound that required the maximum effort.